[p4] P4V integrate question

Silgi, Nir nsilgi at shopping.com
Mon Aug 14 04:52:36 PDT 2006


Hi,

 

For P4V experts (2006.01 version)

 

In the integrate window, why do I have to check the "Limit Integration
to:" check box and enter a path in order to be able to Limit Revision
Range?

If I check the End checkbox (with or without the Start checkbox) without
checking the limit to path checkbox, the Revision Range is not reflected
in the integration.

 

In the end I would like to reproduce a command like p4 integ -b
REL2-MAIN @REL2 in P4V where REL2 is the label. I didn't succeed to see
this exact command in the P4V log window.

 

Thanks in advance,

NirS

 



More information about the perforce-user mailing list