[p4] rolling back
David Weintraub
qazwart at gmail.com
Mon Feb 5 16:27:30 PST 2007
Not too much of an issue if these are indeed the most recent and
you've done no integration. The full directions can be found in Tech
Note #14 <http://www.perforce.com/perforce/technotes/note014.html>. It
basically involves sync'ing back to the earlier version, checking the
files that were changed for edit, sync'ing to the head, and resolving
the changes with a "p4 resolve -ay".
A little more work if there were files added or deleted. Even more if
changes were submitted that you want to keep after the bad
changelists. It's all there in the Tech Note.
On 2/5/07, Zoltan Grose <zgrose at mac.com> wrote:
> So I'm 3 changelists deep into a migration effort and things are not
> going well. So I'd like to "undo" the last 3 submitted changes. I've
> never actually gone backward in perforce so some pointers on the
> right way to do it would be great. A quick glance at the
> documentation table of contents didn't show any obvious hits. Is this
> some kind of a forward integration or do I just delete changelists?
> Fortunately (I think), these 3 changelists are the last 3 in the
> database but I'd be interested in the more general case of when they
> might be several changelists back as well.
>
> Thanks in advance. Free beer on me if you're in the Bay Area. =)
>
> -zoltan
> _______________________________________________
> perforce-user mailing list - perforce-user at perforce.com
> http://maillist.perforce.com/mailman/listinfo/perforce-user
>
--
--
David Weintraub
qazwart at gmail.com
More information about the perforce-user
mailing list