Is there a way to integrate a single Changelist across several branches
at once? It seems like there was a thread on this in the past but I
could not find it. I made a Submit into main with Changelist
35431...build locally and unit tests pass and now I want to propagate
only my changes across two branches (1.0 and 2.0). I would like to
accomplish this without extra languages or utilities installed on each
developer PC if possible. Calling a bat file from a Tool menu that runs
the P4 integ command would be perfect if I could get the syntax correct.
Trying to go from one branch to another works fine so I tried to add a
second branch by just adding it to the same line and I get the following
error.
C:\>p4 integrate -o //IntegrateTest/main/... at 35431
//IntegrateTest/1.0/... //IntegrateTest/2.0/...
Usage: integrate [ -c changelist# -d -D<flag> -f -h -i -o -n -r -s from
-t -v ] [ -b branch to... | from to ]
Missing/wrong number of arguments.
ToddZarnes | Activant Eclipse | SCM Manager | Tel: 303.938.8801 Ext:
1544
Notice: This transmission is for the sole use of the intended recipient(s) and may contain information that is confidential and/or privileged. If you are not the intended recipient, please delete this transmission and any attachments and notify the sender by return email immediately. Any unauthorized review, use, disclosure or distribution is prohibited.
More information about the perforce-user
mailing list